Recent Stories
Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: RobotsBlack October Wasn't an Attack Wave. It Was a Warning.Extreme Ownership Means Ultimate Achievement – NASA Culture Shift
← Back to the board
News

Transmission Planning for Long-term Reliability

Why it’s here: A think-tank report on transmission planning and resource adequacy gaps in US grid planning bears directly on FERC/regional transmission policy and energy reliability, a live federal policy area under the Energy scope.

Trace across the board

Item

  1. 8d agoThe Brattle GroupTransmission Planning for Long-term ReliabilityBrattle Group, with PNNL and Telos Energy, publishes a report identifying gaps that keep regional and interregional transmission planning from accounting for transmission's resource adequacy value, raising generation costs for consumers.1 outletEnergy3 linked

Connected

3 links

About

  • Brattle Group

Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy

Transmission Planning for Long-term Reliability — The Wave