Recent Stories
American Biotech — The Future Can’t Be Won Without It.RSI is AI Building AI. What DC needs to know about it. Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: Robots

The Wave

Senatein sessionHousein session
Refreshed 1 min ago
Hill

The NRC is publicizing receipt of the second part of Holtec's phased construction permit application for the dual-unit SMR-300 Pioneer plant at the Palisades site in Michigan.

Why it’s here: An NRC construction permit application for a dual-unit SMR-300 advanced nuclear plant is squarely within the energy area and directly involves federal nuclear licensing.

Trace across the board

Item

Connected

9 links

About

  • Nuclear Regulatory Commission
  • Holtec International

Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy

The NRC is publicizing receipt of the second part of Holtec's phased construction permit application for the dual-unit SMR-300 Pioneer plant at the Palisades site in Michigan. — The Wave