Recent Stories
American Biotech — The Future Can’t Be Won Without It.RSI is AI Building AI. What DC needs to know about it. Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: Robots

The Wave

Senatein sessionHousein session
Refreshed just now
Hill

H.R. 10988 would direct FERC to require public utilities to deploy advanced transmission technologies on certain projects, and was referred to House Energy and Commerce on November 10, 2026.

Why it’s here: A federal bill directing FERC to require advanced transmission technologies in utility projects is a direct grid modernization and transmission policy item within the Energy scope.

Trace across the board

Item

Connected

5 links

About

  • Federal Energy Regulatory Commission
  • House Energy and Commerce Committee
  • Federal Power Act

Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy

H.R. 10988 would direct FERC to require public utilities to deploy advanced transmission technologies on certain projects, and was referred to House Energy and Commerce on November 10, 2026. — The Wave