Recent Stories
American Biotech — The Future Can’t Be Won Without It.RSI is AI Building AI. What DC needs to know about it. Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: Robots

The Wave

Senatein sessionHousein session
Tracing For data centers, demand flexibility is a responsibility×Refreshed 1 min ago
All24 hours
× Show allIn focus

Navy touts shorter submarine maintenance delays as CBO questions AUKUS sub sales

Navy submarine czar Vice Adm. Rob Gaucher says maintenance delays fell by over 600 days in FY26 and that delivering the first Columbia-class boat in 2028 is achievable. NAVSEA awarded Fairbanks Morse Defense a roughly $100 million follow-on contract for emergency diesel generator overhauls on six Los Angeles- and Ohio-class boats. A CBO finding that AUKUS sales would shrink the US attack submarine fleet for many years adds pressure on production and sustainment capacity. No upcoming hearings or deadlines appear in the items. · 2d ago

Forces, money & more Defense

Activity · 30 days back, 14 ahead

Total
4
Peak/day
1Nov 5
7d
1▼1
Next
—
Σ/day1
Hill0
Contracts0
News4

In the News

One card per story, every outlet that covered it
3
  1. 2d agoLatitude MediaData centers need to earn their powerA Latitude Media partner podcast with Verse's CEO argues that data centers can speed grid connection by coordinating onsite generation and batteries through software rather than waiting years or going fully off-grid.1 outletEnergy2 linked
  2. Nov 6Utility DiveData centers don’t need special treatment to get power fasterVerse CEO Seyed Madaeni argues in a Utility Dive op-ed that data centers should trade financial and operational certainty for faster grid interconnection, citing Ohio, Texas, SPP, PJM and FERC examples.
    2 articles
    1. Nov 6Utility DiveEarliestData centers don’t need special treatment to get power faster
    2. 2d agoUtility DivePickupGrid operators need data center ride-through rules that protect reliability
    EnergyUtilities press FERC for collateral-backed data center transmission contracts as filings13 linked
  3. 13d agoLatitude Media · research by VerseFor data centers, demand flexibility is a responsibilityA Verse executive op-ed, published as partner content by Latitude Media, contends that data centers that bring their own power and flex demand can offset or reduce ratepayer bills, and outlines five responsibility pillars for data center power development.1 outletEnergy1 linked

On the Hill

Congress, the White House and agencies
0

Nothing in Hill activity is connected to this.

Times ET

Contracts

Solicitations, SBIR topics, grants and awards
0

Nothing in contracts is connected to this.

    Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy