Recent Stories
Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: RobotsBlack October Wasn't an Attack Wave. It Was a Warning.Extreme Ownership Means Ultimate Achievement – NASA Culture Shift
← Back to the board
Issue file · proposed

Navy and DoD low-cost small UAS (Group 1) ISR development via SBIR and ONR

Navy/ONR and DoD efforts to develop and field low-cost, attritable Group 1 small unmanned aircraft systems for ISR, including SBIR topics under the DoW SBIR BAA, cost and portability requirements, funding, transition to programs of record, and congressional oversight of small UAS acquisition.

RoboticsDefense
Earliest seen
—
No coverage yet
Articles · 30d
0
No coverage
Outlets
0
—
Hill · 30d
0
None in 30 days or ahead
Contracts · 30d
1
1 open
Momentum
0.6
Articles ±0 vs prior week

Activity

30 days back, 14 ahead · hollow = scheduled
Total
1
Peak/day
1Nov 4
7d
0▼1
Next
—
Σ/day1
Hill0
Contracts1
News0

What's happening

Updated 6d ago

ONR has issued an SBIR topic (DON27BZ02-NV022) seeking proposals for a collapsible, low-cost fixed-wing Group 1 sUAS, with responses due January 6, 2027. No other recent activity, such as hearings, votes or awards, appears in the provided items.

Hill

No policymaker activity in the window.

Contracts

1 contract

ONR SBIR topic DON27BZ02-NV022 for a collapsible low-cost fixed-wing Group 1 sUAS is open; proposals are due January 6, 2027.

Open solicitations
1

Pressure

No outside pressure in the window.

Who covered it, when

A dot per article · ringed = earliest in our sources

No coverage in the last 30 days.

Forces at work

share of articles
  • Procurement & funding1 · 100%ONR is soliciting SBIR proposals for a collapsible low-cost fixed-wing Group 1 sUAS under topic DON27BZ02-NV022, due January 6, 2027.Office of Naval Research · DoD SBIR/STTR

What's next

Times ET
The Wave Terminal · from the 0 outlets we follow on this issue · summary updated 6d ago

Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy