Recent Stories
American Biotech — The Future Can’t Be Won Without It.RSI is AI Building AI. What DC needs to know about it. Keeping the Human in Medicine: Two AI CoLab Researchers on What Machines Can’t ReplaceSomeone Is Hacking the Freezers. Pay Attention.Thinking of Running in 2028? Start HereWhat the Lame Duck Session Has to Do With the Ultimate 21st-Century Power Tool: Robots

The Wave

Senatein sessionHousein session
Refreshed just now
Issue file · activeTracking since Oct 31 · 17 articles · 10 outlets

NASA awards Moon Base contracts as Isaacman reshapes Artemis and SLS

Tracking: Artemis restructuring and Moon Base program

NASA's revised Artemis plan under Administrator Isaacman, including the Artemis III 2027 low Earth orbit test combining SLS/Orion with Starship and Blue Moon landers, the multi-phase Moon Base program (~$10B per phase, 21 landings), the 2028 crewed landing on Artemis IV, SLS's future, human landing system contracts with SpaceX and Blue Origin, and congressional authorization and oversight of cost, schedule and safety.

Space
Articles · 14 days
Earliest seen
Oct 31
NASASpaceflight · Saturday, Oct 31
Articles · 30d
17
2.4 per story
Outlets
10
Most: NASA News (4)
Hill · 30d
0
None in 30 days or ahead
Contracts · 30d
1
$39M awarded, 90d
Momentum
1.4
Articles ▲3 vs prior week

Activity

30 days back, 14 ahead · hollow = scheduled
Total
8
Peak/day
2Nov 11
7d
5▲3
Next
—
Σ/day2
Hill0
Contracts1
News7

What's happening

Updated 17h ago

NASA is rolling out Isaacman's Moon Base program through a wave of November awards, including CLPS 2 with a $10B ceiling, VADR launch task orders of about $1.3B, the PROMISE rover and miniCAST power tower pieces. SLS is being standardized near Block 1 with a stretched Centaur V stage and Mobile Launcher 2 work has stopped, while Artemis III is described as three sequential launches with SLS committed only after Blue Moon is in orbit. Next is the January 4, 2027 deadline for Moon Base demonstration responses under NextSTEP-3 Appendix B.

Latest

17h ago

Our first signal

Hill

No policymaker activity in the window.

Contracts

1 contract

CLPS 1.0 raised to $4.2B and CLPS 2.0 created with a $10B ceiling; Blue Origin PROMISE rover at $94M plus $140M option; Redwire ROSA $40M; NextSTEP-3 Moon Base demo solicitation due Jan. 4, 2027.

Open solicitations
1
Awarded, 90 days
$39M

Top vendors: Northrop Grumman, Boeing, Axiom Space, CALIFORNIA INSTITUTE OF TECHNOLOGY, Space Exploration Technologies Corp.

Pressure

6 articles

Some Mars scientists oppose repurposing the Mars rover test article for the Moon, and the Canadian government is mixed on Canadarm3's future; commercial firms such as Redwire and Astrolab back the approach.

Where the committee leaders stand

On: “NASA should pursue Isaacman's restructured Artemis plan, built around commercial Moon Base contracts and a streamlined SLS, rather than the prior architecture.”
SupportsMixedOpposesUnclearOur read of each leader, from the evidence it cites
BabinLofgren
Not enough on recordReceipts →

Who covered it, when

A dot per article · ringed = earliest in our sources
NASASpaceflightfrom Saturday, Oct 313
Space.comfrom Monday, Nov 92
American Institute of Aeronautics and Astronauticsfrom Monday, Nov 91
NASA Newsfrom Monday, Nov 94
NASA Office of Inspector Generalfrom Monday, Nov 91
Space Policy Onlinefrom Monday, Nov 91
SpaceQfrom Tuesday, Nov 102
Ars Technica Spacefrom Wednesday, Nov 111
Los Angeles Timesfrom Friday, Nov 201
Payloadfrom Yesterday1

Forces at work

share of articles
  • Procurement & funding11 · 65%Moon Base awards flow through CLPS 2, VADR task orders, PROMISE and miniCAST, a two-step white paper process, plus a NextSTEP-3 solicitation and SBIR/STTR seed funding.NASA · Jared Isaacman · Blue Origin · Redwire
  • Public opinion3 · 18%Isaacman describes the Artemis III multi-launch campaign with Blue Moon going first, and NASA promotes a $1M student lunar base challenge.Jared Isaacman · NASA
  • Technical milestones2 · 12%RS-25 engine 10001 completed a 200-second hot fire for future SLS flights, and Lunar Outpost's Pegasus rover passed preliminary design review.NASA · L3Harris · Lunar Outpost
  • Market1 · 6%Astrolab's $219M Crewed Lunar Vehicle award is for a 2028 Moon mission on a Blue Origin lander.Astrolab · Jaret Matthews · Blue Origin

What's next

Times ET

In the news

17 articles

Contracts

1
The Wave Terminal · from the 10 outlets we follow on this issue · summary updated 17h ago

Analytics cookies help us see how the site is used. They only run if you accept. Privacy Policy

NASA awards Moon Base contracts as Isaacman reshapes Artemis and SLS — The Wave